Thursday, 25 November 2021
RESIDENTS GIVE BIG THUMBS UP TO 20MPH ZONE
Thursday, 4 November 2021
WELCOME REMEDY FOR PARK VISITORS
This is an initiative that I have been pressing Cheshire East Council to embrace for many months and I am really pleased that it is finally going to become a reality next week. I know from the conversations I have had with residents that this is something that many will want to welcome and look forward to purchasing light refreshments from when they are visiting the park.
"Juicy Remedy" will operate intially on Thursdays, Fridays, Saturdays and Sundays from a beautifully converted Citroen HY van that will be positioned between the bandstand and children's play area. A range of products will be available including pressed fruit and vegetable juices, along with quality coffee and wellness lattes, as well as delicious and nutritious treats.
Remedy will also be making an appearance at the Christmas Lights Switch On on Saturday 13th November, at South Street Car Park, with a focus on quality, health, wellbeing and sustainability. Remedy will be operated by a local business owner and I would like to wish them every success. I believe this facility will be a very welcome addition to our village park.
CCTV CONTROL ROOM REPORT - QUARTER 2 2021/22
I am pleased to attach our Q2 report from the CCTV Control Room, which shows that a total of 55 incidents were recorded during the period. Some of which led to no further action following an initial review of the system (these incidents might include instances of the team observing apparently suspicious behaviour or monitoring an individual in a state of drunkenness making their way out of the village).
Over the last 18 months, the CCTV team has carried out an upgrade of our surveillance equipment, which now includes full HD and nighttime vision. The team were recently inspected by the Security & Alarms Inspection Board (SSAIB) for the Management and Operation of Public Space CCTV (known in the industry as the "platinum standard" with only a handful of the 400+ councils nationwide holding the mark.
Of the incidents recorded in Alderley Edge over the last quarter, a small number did result in further action being taken and CCTV footage being successfully used to identify the perpetrators, including: a large fight taking place outside one of our licensed premises, after which the CCTV team were requested by police to get face shots of those involved; CCTV picking up an individual about to leave by car, apparently under the influence of alcohol. The team contacted the police who stopped the vehicle and arrested the driver.
The Parish Council continues to fund the provision of CCTV surveillance in conjunction with Cheshire East Council, to protect the safety of our residents, business owners/workers and their property.
Wednesday, 27 October 2021
COMMUNITY SURGERY - SATURDAY 30TH OCTOBER
I would like to remind residents that I will be holding my regular community surgery this Saturday morning, between 10am and 11am at Alderley Edge Library. Please do come along and join me for a chat if there are any community related issues you would like to discuss.
In line with government restrictions, regrettably I was forced to cancel my face-to-face indoor surgeries during the pandemic; however, in line with the removal of formal restrictions, I have now re-started my surgery on the last Saturday of each month.
I look forward to seeing you this Saturday.
Friday, 15 October 2021
COMMUNITY SPEEDWATCH - A SPEEDING VEHICLE EVERY MINUTE ON WILMSLOW ROAD
On Thursday 14th October, I joined Parish Councillors Bev Chapman and Karen Robinson along with other local volunteers from our Community Speedwatch Team. On this occasion we were stationed on Wilmslow Road between 2pm and 3pm, during which time we recorded no less than 60 vehicles exceeding the speed threshold (in other words, one speeding vehicle per minute).
Sunday, 10 October 2021
KNUTSFORD ROAD TO CLOSE FOR CARRIAGEWAY REPAIRS
Earlier this summer, carriageway patching works were carried out on Macclesfield Road and the results have been a welcome improvement for all road users (motorists, cyclists and pedestrians). The works to Knutsford Road will begin at the junction with Brook Lane (Alderley Edge), continue through Chorley and on until the Bird in Hand at Mobberley.
While most of the planned works fall outside the Alderley Edge Ward Boundary, I am sure that many residents of the village who travel this route regularly will be pleased to hear the news. I hope they will also share my joy that the mini-roundabout at the junction of Brook Lane and Knutsford Road is to be completely resurfaced and re-marked at the same time.
Due to the extent of the planned works, which are proposed for early November, there will be a nine-day rolling road closure of various sections along Knutsford Road. At the time of writing, I am still waiting for confirmation of the exact dates, but will post these to my blog and share them on social media as soon as I am made aware of them.
Whilst the route will be closed to through traffic, engineers from Cheshire East Highways will do their best to enable access to residential properties and businesses at all times.