ROADWORKS - W/C 31ST OCTOBER

Please be aware of the following planned works around Alderley Edge this week and allow extra time for your journey if driving past these locations:

31/10/16 - 02/11/16 - No. 102 Brook Lane (United Utilities Water Ltd) two-way traffic signal

02/11/16 - 04/11/16 - Moss Lane (CE Highways footpath repairs) traffic signal give & take

07/11/16 - 07/11/16 - Wilmslow Road (CE Highways carriageway repairs) two-way traffic signal

11/11/16 - 17/11/26 - Redesmere Drive (ENW excalon connections work) no traffic signal

Wednesday 26 October 2016

ANNIS ROAD PATCHING

Following a report I submitted a few weeks ago on the condition of Annis Road, I am pleased to say that a section of the road surface has now been properly patched and is looking in a much better condition.  I would like to thank Cheshire East Highways for the work they have carried out to date.  If anyone is aware of any other serious road defects close to where they live, please fill in the comment box below.






Tuesday 25 October 2016

CAR PARK RE-OPENS

As many of you will have noticed, the Car Park at Ryleys Lane has now re-opened, following a week long closure for resurfacing and marking out.  I am sure everyone will agree that it is a huge improvement and on behalf of all residents of Alderley Edge, I would like to thank Cheshire East Parking for allocating the resource necessary to complete this work.

Ryleys Lane Car Park, Alderley EdgeRyleys Lane Car Park, Alderley Edge

Thursday 13 October 2016

PROPOSED ROADWORKS

The following roadworks will be taking place in Alderley Edge next week:

Wilmslow Road (Horseshoe Farm): two-way traffic signals from 24th October - 1st Nov

Congleton Road (Beechfield Rd): two-way traffic signals from 24th October - 9th December

London Road (Tree Removal): traffic control from 17th - 19th October

Please drive carefully and allow extra time when using these local roads.

Tuesday 11 October 2016

BROOK LANE ROUNDABOUT

I am pleased to confirm that work is progressing with the assessment for a mini roundabout at the junction with Brook Lane and Wilmslow Road.  The Stage 1 Report covers issues such as the accident record at the location and is necessary to demonstrate the need and viability for a roundabout.  A copy of the report will shortly appear on the Parish Council website and in hard copy at Alderley Edge Library.  The Stage 2 Report will be available over the next few weeks and will include an assessment of visibility, vehicle speed, road character, traffic volume, traffic composition, vulnerable road users and noise/vibration.

Brook Lane Roundabout, Alderley Edge

Monday 10 October 2016

ROADWORKS IN ALDERLEY EDGE

Roadworks will be taking place at the following locations this week:

Macclesfield Road (Pine Tree Cottage to The Knoll): two-way traffic signals (until 4th Nov)
Brook Lane (Outside No. 102): two-way traffic signals in place (10th - 12th October)
Haddon Close (Outside No. 5): external water meter being fitted (11th - 13th October)

Please proceed with caution when driving near these locations.

ROAD RESURFACING

Following a recent report I submitted on the state of Heyes Lane (especially the section around The Circuit), Downesway and Meddings Close, I am pleased to report that each of these locations have been including in the plans for level-two patching and resurfacing.  This work will be carried out and funded as part of the 2017/2018 capital budget and I will provide an update when I have more information.



CAR PARK CLOSURE

I'm pleased to confirm that the Ryleys Lane Car Park will be surfaced and marked out during the week commencing Monday 24th October.  Unfortunately, this does mean that the Car Park will be temporarily closed from Monday 24th - Friday 28th October inclusive and that no parking will be allowed whilst the work is being carried out.  Notices advertising the temporary closure will be in place later this week.

Ryleys Lane Car Park

Thursday 6 October 2016

SECTION 106 UPDATE

Following several weeks of negotiation, it has today been confirmed that an existing Section 106 scheme can be used to fund some important and necessary highways projects in Alderley Edge.  The monies (£59,284), which are residue from the development at 17-23 London Road, will be put towards the following projects:

- dropped kerbs at various locations to help make the village more accessible for everyone;
- widening the pedestrian footpath on Chorley Hall Lane (over the railway bridge);
- a one-way system for George St, South St & West St.

I will now be working with officers from CE Highways to put these projects out to public consultation and to proceed with their implementation as soon as possible.