Thursday, 28 June 2018

PARISH COUNCIL NEWSLETTER - SUMMER 2018

The Summer Edition of our Parish Council Newsletter is now being delivered across the village. It is a bumper 12-page edition, covering many different aspects of village life, plus my usual “Your Voice at Cheshire East” update, as well as a map of the village that has been created by the LoveAlderley group, in partnership with the Parish Council. If your copy has not arrived by the end of this weekend, please let me know.







Saturday, 23 June 2018

PROPOSED HEYES LANE TRO

For some time, I have been in discussion with Cheshire East Highways regarding a new Traffic Regulation Order (TRO) on Heyes Lane. This TRO, which would be funded jointly between Alderley Edge Parish Council and Cheshire East Highways, would seek to improve traffic calming and reduce vehicle speed on Heyes Lane, through the creation of additional on-street parking bays. I have prepared a short online survey, in order to gain feedback on the proposals. Although the survey is open to all residents, I am particularly keen to hear the views of residents from the directly impacted areas of Heyes Lane.


Create your own user feedback survey

Friday, 22 June 2018

SPEEDWATCH RESULTS - BROOK LANE 21ST JUNE

On Thursday afternoon, I joined local community speedwatch volunteers, joined by our PCSO (Anna Jenkinson) on Brook Lane. Between 1-2pm we recorded 32 vehicles exceeding the speed threshold. Although this represents a 20% reduction in the number recorded during our last session at this location, it is still too many.

Hopefully, within the next week or so, our new interactive speed sign will be in place at this location. The results in full were:

22 vehicles travelling between 36-39 mph
10 vehicles travelling at 40 mph or above

The highest recorded speed was 44 mph and the average speed of all recorded vehicles was 38.66 mph (the speed limit at this location is 30 mph).



Thursday, 21 June 2018

HEYES LANE CARRIAGEWAY CORING

Please be advised that temporary traffic lights will be in place on Heyes Lane on Monday 25th June, to allow for “carriageway coring”. The work is being carried out by Cheshire East Highways and basically involves drilling small holes through the road surface to inspect the condition of the road bed. The section of Heyes Lane that is due to be affected is from the triangle in front of Grantham’s shop, down to the layby heading out towards “The Hough”. It is the same stretch of road that I have asked to be included in this year’s capital programme for resurfacing.


JUNE COMMUNITY SURGERY

I am pleased to confirm that my monthly community surgery will be held on Saturday 30th June at Alderley Edge Library. Following our very successful "joint surgery" last month, PCSO Anna Jenkinson will once again be joining me from 10.30am until 12.00noon. Do please come along and discuss any community issue with us that may be causing you concern. We are always ready to welcome you with a cup or tea or coffee and biscuits too.



Wednesday, 20 June 2018

BROWN STREET TO CLOSE FOR TWO WEEKS

Unfortunately, I have to confirm that Brown Street is to be closed from this Saturday, 23rd June for a period of approximately two weeks. This is to enable repair work to be carried out on the sink hole that has appeared at the junction of Brown Street & South Street. Further investigation, firstly by Cheshire East Highways and then by United Utilities, has identified that the sink hole is the result of a collapsed sewer on Brown Street. Sewers are the responsibility of United Utilities, who will be carrying out the repair work. I will provide an update when I have more information.